Bienvenue Pour b2b168.com, Inscription gratuite | Inscription En
中文(简体) |
中文(繁體) |
English |Español |Deutsch |Pусский |
| No.13703297

- Maison
- Fils d'alimentation
- Acheter Leads
- A propos de nous
- Produits
- Nouvelles
- Honneurs
- Message
- Contacter
- Les catégories de produit
- Liens amicaux
Winder maintenance reasons?
2015-06-19 Reads : 46
Winder maintenance quality content and technical requirements of the joint inspection: Blowing twist joint strength and quality must meet appearance requirements splicer steel scissors: the cleaning blade area of ??anti-rust lubricant WD-40 maintenance period 10 days bonding parts: use special hair brush, alcohol to clean bonding and bonding takes over, watching the bonding device tiles for damage doffing channels: clean with alcohol and check for damage tiles spindle Cleanup: Clean up around the flower, flower plot untwisting suction tube: Clean pipe product maintenance period spent 15 days rear chassis is: cleaning motor, box, pulleys, fly around, check the belt is easy road, whether the motor gearbox oil leakage, whether sprockets, chains in oil machine Body Cleaning: Cleaning machines behind the position, the front cover of the machine head box parts: clean motors, chains, sprockets parts fly, check chain tension, lack of oil flow fan is clean: clean hair part, rails, back flower boxes, pulleys cheese cradle: Clean and check whether the easy road links, the size of the cartridge bearing rotation is flexible light cheese cradle shock device: the cradle highest position then jumping down, 5mm if Creel drops - 7mm when you feel resistance, said oil is correct, otherwise re-fueling to the standard height spindle refueling: for bearing glib and cassette clutch refueling nozzle tube protruding Check: Check the magazine tube leaks: Clean up around the wire, the plot of flowers, checks whether the normal rotation of high pressure Exhaust: Clean impeller plot of flowers, any abnormal sound, the impeller spins maintenance cycle 30 Weather pressure filter clockwise during operation: cleaning up the contamination, water treatment, check the air pressure is up to standard 6--6.5kg / cm2, brake pressure 3--4kg / cm2 maintenance cycle flow fan rotating shaft 7 days: Check the bearing, clean plot of flowers, oil change for the pile yarn: cleaning product cotton, cotton yarn pile to the balloon control center maintenance cycle 3 month-gauge nozzle and cheese: the two can not collide cheese and grooved pitch: the two can not collide maintenance cycle six-month single-spindle mooch: 1, clean all parts of 2, check the oil shock device cheese 3 amount is normal, check the camming portion of the bearing is damaged 4, check whether the roller tray reverse gear shaft damage, loose 5, the memory device is damaged third stop lever 6, when refueling to be careful not to spray the oil reversing roller shaft of a carbon friction plate and the plate 7, the yellow button screws Phillips screws to check for looseness 8, tie a knot in the middle of the cam gear Hexagon socket screws, refueling 9, the drive teeth tight SHCS refueling tie cam Group: Refueling the magazine, cop cam: Come large nozzle gear: The gear screw tightening, check the correct position of the large nozzle small nozzle gear: Cleaning product spent fuel cartridge spindle clutch: clean up plot flower, refueling, inspection socket head cap screws are loose in the spindle motor gear box: clean, inspect bearings, oil change maintenance period nine months of the spindle motor gear box: clean, inspect bearings, oil change conveyor motor gear box: clean, check the bearings, oil change cradle big chuck piston rod: clean, oil change cradle small cartridge bearings: clean, inspect bearings, oil change maintenance period of 3 years
keywords: Winder, Winder maintenance, TRW textile,
Administrateur>>>
Vous êtes le 24180 visiteur
Droit d'auteur © GuangDong ICP No. 10089450, Textile Machinery Co., Ltd, Jiangsu TRW Tous droits réservés.
Support technique: ShenZhen AllWays Technologie Développement Co., Ltd.
AllSources réseau's désistement: La légitimité de l'information de l'entreprise ne s'engage pas à toute responsabilité de garantie
Vous êtes le 24180 visiteur
Droit d'auteur © GuangDong ICP No. 10089450, Textile Machinery Co., Ltd, Jiangsu TRW Tous droits réservés.
Support technique: ShenZhen AllWays Technologie Développement Co., Ltd.
AllSources réseau's désistement: La légitimité de l'information de l'entreprise ne s'engage pas à toute responsabilité de garantie